Navigation path

Action 73 in Slovenia flag Slovenia

Member States to agree on common additional functionalities for smart meters

Indicator Status Evidence
Has the NRA (or country) conducted a cost benefit analysis on the roll-out of smart metering for electricity? Yes Distribution System Operator has preformed a CBA.
Does the Cost Benefit Analysis cover the 10 functionalities as per the European Commission Recommendations ? Yes 1. (a) YES 2. (b) PARTLY 3. (c) YES 4. (d) YES 5. (e) YES 6. (f) YES 7. (g) YES 8. (h) YES 9. (i) YES 10. (j) PARTLY
Was the Cost Benefit Analysis positive in relation to the above-mentioned functionalities ? Yes

Other initiatives:

External contribution

External contributions are more than welcome. If you would like to share with us a country, regional or local-level initiative relevant for this DAE action, you can do it via the online form.