Navigation path

Action 96 in Switzerland flag Switzerland

Member States to fulfil obligations under European Rail Traffic Management System (ERTMS)

Indicator Status Evidence
Do you have a National Deployment Plan on ERTMS? Yes http://www.bav.admin.ch/themen/03818/index.html?lang=de&download=NHzLpZeg7t,lnp6I0NTU042l2Z6ln1acy4Zn4Z2qZpnO2Yuq2Z6gpJCDen55fGym162epYbg2c_JjKbNoKSn6A-- The link above shows the current deployment plans for the Swiss standard gauge network (1435mm). The document is presently only available in German. Beginning of February 2013 the document will be available also in French, Italian and English.
Will the lines due to be equipped (as per European Deployment Plan) be ready for 2015? Yes The North-South Axis belonging to corridor A/1 will be equipped by timetable change in December 2015.

Other initiatives:

External contribution

External contributions are more than welcome. If you would like to share with us a country, regional or local-level initiative relevant for this DAE action, you can do it via the online form.